The Waste Management Unit has started with the upgrade of the Chunga disposal site
to an engineered landfill in order to improve the protection of the
environment. The plans include the construction of a disposal area with a
plastic bottom liner to prevent that polluted water from the waste can
penetrate into the soil and pollute the groundwater.
|
| For the construction of
the new landfill a contract has been signed between the Lusaka City Council
and the Contract Raubex Construction Zambia Ltd in joint venture with Raubex
Construction PTY LTD of South Africa. Supervision of the construction works
is done by RambØll
a consultancy firm from Denmark and Civilstruts Consulting Engineers from
Lusaka. The landfill construction is funded by the Danish International
Development Assistance, DANIDA. The new
landfill will include a lined disposal area, two weighbridges, offices for
landfill staff and a small workshop annex parking for landfill equipment.
The entire landfill will be fenced off to prevent unauthorised access. |
| Disposal Charges
Waste Charges at Chunga Landfill, are as follows:
| Amount of waste |
Charge |
| Up to 1,000 kg |
K20,000 |
| 1,000 kg or more |
K20 per kg |
|  |
|
For special waste e.g. expired food stuffs, the charge is different. Our
inspectors have to first inspect the special waste and determine how much the
client has to pay.
| |